What sized THWN copper conductors are required to supply a 120V/208V, 3 phase panelboard with 20.5 kVA of noncontinuous load and 25kVA of continuous load?

Prepare for the NCCER Load Calculations – Feeders and Services test with comprehensive practice material. Study using quizzes and detailed explanations to boost your exam confidence and ensure success!

Multiple Choice

What sized THWN copper conductors are required to supply a 120V/208V, 3 phase panelboard with 20.5 kVA of noncontinuous load and 25kVA of continuous load?

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy